Daftar SegeraJadwal Training Lengkap 2018
Jadwal Training Pelatihan :

Developing Permit To Work System And Method Statements (BANDUNG)

Developing Permit To Work System And Method Statements (BANDUNG)

TRAINING TIME :   

  • 18 Jun 2015-19 Jun 2015
  • 27 Jul 2015-28 Jul 2015
  • 19 Aug 2015-20 Aug 2015
  • 17 Sep 2015-18 Sep 2015
  • 12 Oct 2015-13 Oct 2015
  • 19 Nov 2015-20 Nov 2015
  • 29 Dec 2014-30 Dec 2014

VENUE :   Hotel Kagum Group Bandung (Golden Flower, Banana Inn, Grand Seriti, Carrcadin, Amaroossa, Grand Serela, Gino Feruci, Verona Palace, Malaka, Zodiac Taurus)

TRAINING DURATION :  2 days

INTRODUCTION:
Permits to work are used to control high risk work activities, such as hot work, work at height, confined spaces work etc. Method statements are used in many industries, again as a control measure to detail the correct and safe sequence for work operation.

OBJECTIVES:
The purpose of this training  is to help in determining if a job requires a work permit due to ESS&H hazards, system complexities, or work coordination needs.  If the job already has an established work procedure or has been reviewed and defined as “Worker Planned” work due to the training and qualifications of the crafts person or technician, then the checklist is not needed.

WHO SHOULD ATTEND THIS TRAINING?:
Anyone who uses or issues permits to work and anyone who produces or used method statements.

TRAINING MATERIAL OUTLINE:

  1. Overview of safe systems of work
    • Human Engineering
    • Machine and Tools guarding
    • Behavioral factors
  2. The purpose of permits and method statements
    • ESS&H or Other Permits Needed
    • Safety, Security and Facility Concerns
    • Environmental/Waste Concerns
    • Radiation Issues
    • Complexity/Uncertainty Issues
    • Work Coordination
  3. Permit to work systems
  4. Use of the documents in practice
  5. Document templates will be provided to all delegates during the course.

INVESTATION PRICE/PERSON :    

  1. Rp 3.950.000/peserta (bayar penuh)  atau
  2. Rp 3.750.000/peserta (early bird, yang membayar 1 minggu sebelum training) atau
  3. Rp 3.500.000/peserta (grup, untuk 3 peserta atau lebih dari 1 perusahaan yang sama)

FACILITIES FOR PARTICIPANTS :

  1. Training Module
  2. Training CD contains training material
  3. Certificate
  4. Stationeries: NoteBook and Ballpoint
  5. Jacket or waistcoat or T-Shirt
  6. Bag or backpackers
  7. Training Photo
  8. Training room with full AC facilities and multimedia
  9. Once lunch and twice coffeebreak every day of training
  10. Qualified instructor
  11. Transportation for participants from hotel of participants to/from hotel of training (if minimal number of participants from one company is 4 persons)

TRAINING INSTRUCTOR
Bambang Pamudji, B.Sc.,SE. has much real experiences, he is former Senior Health and Safety staff at PT. Pupuk Sriwidjaja,PUSRI(Urea Fertilizer Manufacturer) Palembang. He was born in Pasuruan East Java, 14 March 1950. He got his B.Sc in Public Health from APK Surabaya in 1971 and was graduated from Economic Management Sriwidjaja University, UNSRI, Palembang in 1996. He has certificates in Health, Safety, and Environment (HSE) from Depnakertrans RI/Institutions and Universities in Indonesia, institutions and Universities in UK, and National Safety Council. Experienced in setting up Health and Safety Management System documentation and its application. Experienced internal lead auditor SMK3 in PT. Pupuk Sriwidjaja, and External lead auditor SMK3 for Indonesian Association Fertilizer Producer. He has been teaching industrial training classes for many classes related to topics of his competencies, HSE. Many participants from many companies in Indonesia have participated in his training classes.

Registrasi Tidak Mengikat
  1. Judul Training di atas bisa dijadikan sebagai topik INHOUSE TRAINING. Jika Anda membutuhkan bantuan free konsultasi bisa hubungi 0851-0197-2488/ 0899-812-1246
  2. (required)
  3. (valid email required)
  4. (required)
  5. (required)
  6. (required)
  7. (required)
  8. Mohon untuk tidak memesan tiket perjalanan / akomodasi penginapan sebelum ada kepastian training akan berjalan.
  9. (valid email required)
  10. PENTING : Harga dan Silabus Training sewaktu-waktu bisa berubah. Disesuaikan dengan kondisi terakhir. Jadi MOHON baca email PENAWARAN yang dikirimkan dari Mitra Info Seminar
 

cforms contact form by delicious:days

Silahkan Berbagi :
Jika jadwal yang Anda cari sudah terselenggara (terlewat). Silahkan hubungi kami untuk permintaan jadwal terbarunya di 0899-812-1246