Jadwal Training 2024

Installation, Commissioning, Operation and Maintenance of Centrifugal Pump Training

 

Installation, Commissioning, Operation and Maintenance of Centrifugal Pump Training

Tanggal
16 September 2013
21 November 2013

Pukul
09.00-17.00 WIB

Tempat
Surabaya / Aryaduta Hotel Semanggi/Swiss-Belhotel, Jakarta

Investasi
Rp. 1.500.000, –  (Registration 3 person/more; payment before H-7)
Rp. 1.750.000, –  (Reg before H-14, payment before H-7)
Rp. 2.250.000, –  (Payment On The Spot)
Rp. 2.475.000, –  (Full Fare)

Installation, Commissioning, Operation & Maintenance of Centrifugal Pump Training merupakan suatu program training yang diberikan kepada pelaksana konstruksi /maintenance (Millwright , Mechanical Fitter/Supervisor, Teknisi Maintenance , Maintenance/Project Engineer) untuk memberikan arahan procedure teknis yang benar dan menyeluruh mulai tahap handling, penyimpanan, pemasangan, commissioning . operasi dan maintenance dari pompa centrifugal. Dasar ini juga bisa diaplikasikan untuk Rotating Machinery lainnya seperti Air Blower, Steam Turbine, Air Compressor, dll.

Workshop ini akan menekankan pada cara/prosedure teknis yang perlu dikuasai seorang Teknisi /Engineer konstruksi/maintenance untuk pemasangan dan pengoperasian pompa :

  1. Prosedure handling pompa : cara pengangkatan ,penggunaan alat angkat dan cara menyimpannya secara benar agar terhindar dari kerusakan.
  2. Prosedure Pemadangan Pompa : pemeriksaan dan persiapan pondasi, anchor bolt , leveling , pekerjaan persiapan pada base plate, pemasangan pompa, grouting.
  3. Prosedure Alignment : Alignment Motor penggerak dengan pompa dan Alignment Pompa dengan Piping.
  4. Prosedure Comissioning : flushing pipa suction, pengisian minyak pelumas, Oil Flushing, Motor invididual running test , Final Alignment , Running Test, Acceptable level vibration for machinery.
  5. Prosedure Operasi dan Maintenace : Pengecekkan awal sebelum operasi, pemeliharaan , pemeriksaan / pemeliharaan rutin, dan Trouble Shoot

Silabus :

  1. Installation, Operation and Maintenance Instruction for Model 3700 Goulds Pumps (1995 Gould Pumps.Inc)
  2. Pumps Hand Book, Chapter 12, Installation, Operation and Maintenance , by Igor J Karrasik and C.C .Heald.
  3. Technical Data Sheet, Edition 4, 2009 Sikagrout 214-11
  4. Shaft Alignment hand Book, 3rd Edition, by John Piotrowski
  5. Contamination Hand Book , by Hydac Filtertechnik GMBH

Metode :
Metode yang digunakan: simulasi Foto, video training, diskusi dan ceramah.

Workshop Leader :
Arif Yudianto ,ST.
Telah memiliki pengalaman 7 tahun dibidang operasional dan maintenance pompa, 7 tahun di bidang engineering (pumps selection and sizing) dan 3 tahun di bidang konstruksi (installasi & Commissioning) . Pada tahun 1997 pernah menerima training khusus tentang Steam Turbine di Workshop Siemens, Gorlitz, Germany memberikan dasar yang kuat untuk mengembangkan pendalamannya di bidang Rotating Mesin termasuk Pompa dan Steam Turbine. Sejak tahun 1998 memberikan inhouse training ke teknisi mekanik , beberapa trainee berhasil menjadi teknisi yang berkualitas internasional dan mengerjakan beberapa pekerjaan perbaikan di luar negeri.
Arif Yudianto berlatar belakang pendidikan Teknik Mesin dari ITS.

 

 

Bagikan:

KONTAK CEPAT

Tags

Avatar photo

 

Jika ada kebutuhan Inhouse training atau kelas khusus silahkan hubungi 0851-0197-2488 / 0899-8121-246 Petrus Soeganda. Untuk mengundang Petrus Soeganda sebagai Pembicara Internet Marketing

Tinggalkan komentar

Chat dengan kami
CV INFO SEMINAR
0899-8121-246