Jadwal Training 2024

Reliability Centered Maintenance (RCM) BANDUNG

 

Reliability Centered Maintenance (RCM) BANDUNG

Increasing Safety & Reliability in Gas Pipeline System

Tanggal

  • 22 Feb 2017-24 Feb 2017
  • 27 Mar 2017-29 Mar 2017
  • 26 Apr 2017-28 Apr 2017
  • 22 May 2017-24 May 2017
  • 19 Jun 2017-21 Jun 2017
  • 26 Jul 2017-28 Jul 2017
  • 14 Aug 2017-16 Aug 2017
  • 27 Sep 2017-29 Sep 2017
  • 25 Oct 2017-27 Oct 2017
  • 27 Nov 2017-29 Nov 2017
  • 27 Dec 2017-29 Dec 2017

Jam Pelaksanaan
09.00 – 16.00 WIB

Tempat
Hotel Kagum Group Bandung (Golden Flower, Banana Inn, Grand Seriti, Carrcadin, Amaroossa, Grand Serela, Gino Feruci, Verona Palace, Malaka, Zodiac Taurus)

Pembicara / Fasilitator
Ir. Deddy Nugraha is a dedicated experienced fulltime trainer and technical consultant since 2002. He holds a B.S. degree in Mechanical Engineering from ITB, Bandung. He has worked nationally in a wide variety of industries including: technology, aerospace, utilities, auditing, mining and institutions thus engaged as a corporate consultant. He also holds certifications for those particular fields from Snecma, France; Engine Support Inc., USA; Danobat, Spain; DNV, Singapore; MTU, Germany and FAA Auditor, USA. Mr. Nugraha is a member of Indonesian Society for Reliability and was elected as General Sectretay for 2004-2007 period. He has trained hundreds of managers, engineers and floor associates, subjects taught to include; CMMS, RCM, TPM, Project Management, Quality Process Control, Corrosion Control and Protection, Failure Analysis, Engineering Design, Instalation & Constrcution, Inventory Control and Management. Major clients include: Pertamina, British Petroleum, Petrochina, Siemen Power, PT. Indonesia Power, PT. Krakatau Steel, Freeport Indonesia, PT. Surveyor Indonesia, Chevron, Medco Energy, PT. Aneka Tambang, Garuda Maintenance Facility, PT. Perusahaan Gas Negara, PT. Semen Padang, PT. Semen Gresik, PT. Indah Kiat Pulp & Paper, PT. Tjiwi Kimia, PT. Pupuk Kujang and PT. Kaltim Prima Coal.

INVESTATION PRICE/PERSON :

  • Rp 6.500.000/person (full fare)  or
  • Rp 6.250.000/person (early bird, payment 1 week before training) or
  • Rp 5.950.000/person (if there are 3 persons or more from the same company)

FASILITAS UNTUK PESERTA :

  1. Modul Training
  2. Flash Disk berisi materi training
  3. Sertifikat
  4. ATK: NoteBook dan Ballpoint
  5. T-Shirt
  6. Tas
  7. Foto Training
  8. Ruang Training dengan fasilitas Full AC dan multimedia
  9. Makan siang dan 2 kali coffeebreak
  10. Instruktur yang Qualified
  11. Transportasi untuk peserta dari hotel penginapan ke hotel tempat training – PP (jika peserta minimal dari satu perusahaan ada 4 peserta)

INTRODUCTION :
This course teaches the fundamentals of Reliability-Centered Maintenance (RCM). The course gives the participant fundamental tools and knowledge required to participate in any RCM analysis process especially in gas pipeline industry. Participant will have a good practice to developing and implemeted RCM .

WHO SHOULD ATTEND THIS TRAINING?
Maintenance managers, maintenance supervisors, reliability and maintenance engineers, maintenance technicians, production managers, production supervisors, operators, plant engineers, and anyone who is involved in operating and maintaining of assets.

TRAINING OBJECTIVE :
After the course participant will have a good understanding of :

  1. Fundamental Reliability Centered Maintenance (RCM) philosophies
  2. How to evaluate failure consequences
  3. How to select preventive maintenance tasks and intervals
  4. How to select predictive maintenance tasks and intervals
  5. How to select failure finding tasks and intervals
  6. What other function protective actions are available
  7. When run-to-failure is appropriate
  8. How to packaging and implement RCM analysis results
  9. Commercial RCM standards
  10. Various approaches to RCM
  11. RCM terminology
  12. Identifying and allocating resources for a RCM program
  13. Techniques for prioritizing systems for analysis
  14. Use of Weibull and statistical analysis in RCM processes
  15. Packaging and implementing RCM analysis results

TRAINING MATERIAL OUTLINE :
A. Theory

  1. Introduction to Reliability Centered Maintenance (RCM) concepts
  2. RCM analysis preparation
  3. Techniques for prioritizing systems for analysis
  4. Failure Modes and Effect Consequence Analysis for RCM
  5. Evaluating failure consequences
  6. Statistics in RCM
  7. Statistical principles used in RCM
  8. Use of Weibull analysis in RCM processes
  9. Selecting the right maintenance tasks for reliability
  10. How to select preventive maintenance (PM) tasks and intervals
  11. How to select predictive maintenance (PdM) tasks and intervals
  12. How to select failure finding tasks and intervals
  13. Other functional maintenance strategies
  14. When Run-to-Failure is appropriate
  15. implementing RCM results

B. Workshops (practice)

  1. Applied RCM in station gas compressor
  2. Gas turbine-compressor system
  3. Gas treatment plant ( gas dehydration system, H2S removal)participants should prepare their laptop, P&ID, Process flow

C. Interactive Discussion

 

Bagikan:

KONTAK CEPAT

Tags

Avatar photo

 

Jika ada kebutuhan Inhouse training atau kelas khusus silahkan hubungi 0851-0197-2488 / 0899-8121-246 Petrus Soeganda. Untuk mengundang Petrus Soeganda sebagai Pembicara Internet Marketing

Tinggalkan komentar

Chat dengan kami
CV INFO SEMINAR
0899-8121-246