Jadwal Training 2024

Project Management: Construction Scheduling with Primavera Project Planner

 

Project Management : Construction Scheduling with Primavera Project Planner

Tanggal
30 Mei-2 Juni 2012

Pukul
09.00 – 16.30 WIB

Lokasi
Hotel Ibis Malioboro * Jogyakarta

Description
The intent of this training is to assist the user in developing a proficiency in construction Planning and a working knowledge of Primavera Project Planner. In order for the trainee to get the most out of this training material, he or she should have a basic understanding of how construction projects are estimated and how they are assembled. The Topic on estimating is included to develop terminology and to show the relationship between the estimate and the comprehensive construction Plan. It is essential that the information developed for the estimate be presented in fashion that can be easily used during the actual construction process.

A.      BASIC

  1. Overview
    • Key Terms
    • The Project Management Process
  2. The Estimate Process
    • Key Terms
    • Introduction
    • Work Breakdown
    • Bare Labor costs
    • Productivity
    • Activity Duration
    • Adjusting the Activity Duration
    • Bare Material Costs
    • Bare Equipment Costs
    • Subcontract Costs
    • Indirect Field Cost
  3. Scheduling Logic
    • Key Terms
    • Scheduling
    • Activity Relationship
    • Finish-To-Start Relationship
    • Start-To-Start Relationship
    • Finish-To-Finish Relationship
    • Graphic Conventions
    • Construction Logic
    • Lags
    • Related and Nonrelated Concurrent Activities
    • Sample Scheduling
    • Conclusion
  4. Calculating The Project Schedule
    • Key Terms
    • Forwad Pass
    • Backward Pass
    • Float
    • Critical Path
    • Project Calendar
    • Sample Schedule
    • Conclusion

B.      USING PRIMAVERA TO SOLVE THE PROJECT MANAGEMENT PROBLEMS

  1. Creating and Saving Projects Using Primavera
    • Key Terms
    • Creating a New Projects
    • Saving a Project
    • Opening an Existing Project
    • Backing Up Projects
    • Restoring a Projects
    • Copying a Project
    • Conclusion
  2. Project Setup
    • Key Terms
    • Calendar Setup
    • Activity Codes
    • Project Codes
    • Conclusion
  3. Loading the Schedule Logic
    • Activity  Input-Activity Form
    • Importing Activity Data
    • Relationship Input
    • PERT Activity Input
    • Calculating the Schedule
    • Changing the Time Scale
    • Recognizing the Schedule
    • Printing Out the Main Input Screen Bar Chart
    • Conclusion
  4. Tabular and Graphic Output
    • Key Terms
    • Generating Reports
    • Graphical Reports
    • Conclusion
  5. Summarizing the Schedule
    • Key Terms
    • Summary Schedules
    • Activity Codes Summary Schedule
    • Hammock Activity
    • Hammock Activities in Primavera Project Planner Schedule
    • Flags
    • Conclusion
  6. Updating the Schedule
    • Key Terms
    • Target Schedules
    • Establishing a Target Schedule within Primavera Project Planner
    • Developing an Update Report
    • Updating the Schedule
  7. Resource Loading
    • Key Terms
    • Resources
    • Resource Loading
    • Defining Resources
    • Defining Cost Accounts
    • Loading Resources on the Individual Activities
    • Producing Resource Loading Reports
    • Graphic Resource Output
    • Conclusion
  8. Cost Loading and Cash Flow
    • Key Terms
    • Loading Cost Data on the Individual Activities
    • Cash Flow
    • Conclusion
  9. Progress Planning and Control
    • Key Terms
    • Developing the Progress Plan
    • Determining Actual Project Progress
    • Creating Planned Progress Curves
    • Superimposing Curves
    • Conclusion
  10. Project Analysis and Forecasting
    • Key Terms
    • Project Costs
    • Analysis of Labor Operations Report
    • Labor Performance
    • Material Subcontract Costs
    • Conclusion

Investasi:
Rp 6.500.000,00/Peserta
Setiap peserta akan memperoleh ‘Certificate of Accomplishment’ dari WMGC, Gandaan Materi baik hardcopy (makalah) maupun softcopy (CD Materi), dan konsumsi (makan siang dan 2xmeals).

Pembicara
Marthen Luther Doko
Alumnus Institut Teknologi Bandung tahun 1982  dan melanjutkan S2 di Institut Teknologi Bandung lulus tahun 1997. Saat ini menjabat sebagai Department Head  of  Chemical Engineering Dept. National Institute of Technology dan  Lecturer in Chemical Engineering Dept. National Institute of Technology.

Sering mengikuti seminar di dalam dan luar negeri antara lain : International Seminar on Chemical Engineering 2010, International Federation of Automatic Control Simposium on Automatic Control 2006, International Symposium on Chemical Engineering, Hanoi 2005, Seminar Nasional Teknik Kimia “Kejuangan” 2007, dll.

 

Bagikan:

KONTAK CEPAT

Tags

Avatar photo

 

Jika ada kebutuhan Inhouse training atau kelas khusus silahkan hubungi 0851-0197-2488 / 0899-8121-246 Petrus Soeganda. Untuk mengundang Petrus Soeganda sebagai Pembicara Internet Marketing

Tinggalkan komentar

Chat dengan kami
CV INFO SEMINAR
0899-8121-246